Henan Tianfon New Energy Tech. Co., Ltd

Henan Tianfon New Energy Tech. Co., Ltd.

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Solar System Components /

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Contact Now
Henan Tianfon New Energy Tech. Co., Ltd
Visit Website
City:xinxiang
Province/State:henan
Country/Region:china
Contact Person:MissZhang
Contact Now

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Ask Latest Price
Video Channel
Brand Name :TIANFON
Model Number :Ground Screw Piles
Certification :SGS,ISO 9001,ISO 14001,OHSAS 18000
Place of Origin :CHINA
MOQ :5 set
Price :USD800-2000/set
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :30MW/month
Delivery Time :15-25 work days
Packaging Details :standard export packing
Install site :All types of Soil
Material :Steel Q235B
Diameters :76 mm~200 mm
Thickness :3~3.5mm
Anticorrosive :High class hot dip galvanized
Length :500~2500 mm
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

500~2500mm Length Customize Design Ground Mounting Screw Pile Driving Rack

Ground Screw Piles is the preferred foundation in many applications, such as Photovoltaic Solar Farm construction, Timber-frame Housing, Timber Decking, Street Light and Fence construction, Temporary Site Accommodation, Bill Board/Advertising Signs and many more applications.

Specifications:

Name

Size(mm)

Thickness(mm)

Material

Surface treatment

Photo

Piles with flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Piles without flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Steel pipe piles

φ 76/89,1000-2000mm(Length)

4

Q236B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Products can be customized according to customer requirement.

Features:

Are cost effective

Can be installed through ground water without casing

Can be removed for temporary applications

Are easily transported to remote sites

Typically required less time to install

Torque is a strong verification of capacity

Reduce the number of truck trips to a site

Eliminate concrete curing and formwork

Can be installed at a better angle for added laterial risistance

Can be installed with smaller more accessible equipment

Are installed with low noise and minimal vibrations

Can be galvanized for corrosion resistance

Minimize disturbance to environmentally sensitive sites

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Packaging and delivery:

► Port: Tianjin, Shanghai, Qingdao

► Package: strong and long distance transportation package

► Payment Terms: L/C,D/A,D/P,T/T

► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Our Certificates:

500~2500mm Length Ground Mounting Screw Pile Driving Rack

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Inquiry Cart 0